ORR–PRR Link via Mahadevapura, Doddanekkundi to Be Fast-Tracked; BECC Sets March 10 Deadline
Bengaluru: The proposed 24-metre-wide road connecting the Outer Ring Road (ORR) to the Peripheral Ring
Bengaluru: The proposed 24-metre-wide road connecting the Outer Ring Road (ORR) to the Peripheral Ring